Analysis

According to contract or manufacture form to analysis the requirement, such as head, quantity and efficiency etc. And perform parts selection or develop new parts.

Drawing

According to the specification analysis to drawing.

Document production

Submit the drawing to the purchasing department for ordering raw materials or outsourcing.

Quality inspection

After the parts processing complete need to quality inspection.

Intermediate inspection

We can provide dynamic balance test of impeller or motor rotor, motor performance test and motor coil inspection etc.

Parts assemble

The part can separate motor and water machine parts to assemble.

Assemble completed

Pump can set up after pass the inspections.

Performance Testing

After pump assembly completed then moved to the laboratory for the first time testing.